
U.S. Air Force Base
TC Controls was selected and has remained on one of New England’s largest Air force Bases; providing building automation solutions for the bases critical systems. TC Controls utilized Johnson Controls Facility Explorer paired with a Niagara front-end, in order to create a secure yet open-protocol system that keeps the base running at full efficiency. TC […]

Aquaponics
This Farm, located in northern New England recently expanded in order to produce over two million heads of lettuce a year! TCC was excited to be apart of such a unique, but increasingly popular way to farm leafy greens: Aquaponics. Aquaponics is where the farm utilizes waste by-product from fish (tilapia) as a food source […]

Nitto Denko Avecia
This project consisted of a multi-phased expansion to its Milford, MA biologic’s manufacturing facility. TC Controls was contracted by A/Z Corporation to install a new control system with integration to the existing building management system.

Cannatech Medicinals
A new 50,000 square foot cultivation facility located in Fall River MA. Our scope included the installation and integration of three independent systems that included HVAC controls, Argus grow and fertigation controls, and a Co2 enrichment system. We designed and engineered the installation and integration of these systems to eliminate system duplication, and reduce installation […]

Natures Remedy
Renovation and conversion of a cold storage warehouse to a state-of-the-art cultivation facility. Our role in this project was the installation and commissioning of a fully automated co2 enrichment system. Since the completion of the project we have been brought in to help solve integration issues.

Reliant Medical – Shrewsbury
A new 1-story medical office building located in Shrewsbury MA. TC joined Cutler Associates and KMD Mechanical on this project. Our scope included the installation of a full DDC system controlling 40 VAV units.

Boston Village Volvo
This building was built in 1926 and was a former tractor factory. TC Controls was brought in to join the cm&b and Global Mechanical team to install and commission a full DDC control system.

Gibbs Middle School
The Gibbs building originally built in 1928 was renovated to create a 6th Grade Middle School for approximately 500 students. TC Controls Teamed with General Mechanical on this project and installed and commissioned a full DDC control system.

Green Thumb Industries
Partial renovation of 45,000 square-feet of the old Whitmore Manufacturing Company, to house a new state of the art Cultivation facility. TC joined the cm&b team working under B-G Mechanical. TC installed and integrated all 4 control systems including fertigation, HVAC, Co2 and lighting. This flagship project allowed us to showcase the quality and attention […]

One Cabot Rd
This 65,000 square foot building was built in 1989 with an original pneumatic control system. The new owners of this facility contracted TC Controls to remove and upgrade the existing pneumatic controls with a state of the art DDC control system. This new system provides for better energy efficiency, a stable, more comfortable climate […]